Start while the old unit runs. A co-op or condo replacement moves through proposals, board votes, and sometimes an engineer’s assessment — weeks to months of process. A January emergency under those timelines is the worst version of this project: rushed decisions, premium scheduling, cold residents. The board conversation belongs in the fall, not in the failure.
Give the board evidence. A pro surveys the building — load, distribution, venting, fuel, the old unit’s documented condition — and hands the board findings it can actually deliberate over: what’s failing, what continued patching costs, what the replacement involves and when. Boards decide well on evidence; they decide badly under pressure.
Small homes move faster. The Ditmars 1–2 family houses answer to one owner, not a board — but the same discipline pays: survey first, decide on the numbers, schedule the swap for milder weather if the old unit can limp to spring.